Joyventa
Project StudioMy ProjectStart a Project

Joyventa · Destination development partner

From empty spaceto extraordinary destination.

One partner for entertainment projects — from concept and attraction sourcing to systems, shipping and opening support.

001 / 119Alpine Coaster · Attraction

What do you have?

I have

Start from the opportunity, not from a product list. Hover a site to see what it could become — then start from it.

Entertainment worlds we build

Ten worlds.One way of building them.

Arcade

Arcade

01

Redemption, racing, prize — the revenue engine of every FEC.

Explore Arcade →
Playground

Playground

02

Soft play to ninja courses, zoned by age.

Explore Playground →
Theme Park

Theme Park

03

Rides and story lands at destination scale.

Explore Theme Park →
Snow

Snow

04

Real snow, all year, in any climate.

Explore Snow →
Mountain

Mountain

05

Coasters, lifts and platforms that monetise altitude.

Explore Mountain →
Forest

Forest

06

Canopy courses with a light footprint.

Explore Forest →
Water

Water

07

Slides, waves and rivers — the summer driver.

Explore Water →
Karting

Karting

08

Electric fleets, timing and race control.

Explore Karting →
Immersive

Immersive

09

VR, projection and rooms that become the story.

Explore Immersive →
Adventure

Adventure

10

Ropes, climbing, swings and free-fall.

Explore Adventure →

One project. One partner.

Every stepowned by one team.

Twenty-one capabilities, one contact. From the first look at a site to spare parts years after opening — nothing falls between suppliers.

See the full process

Phase 01

Idea

  • Opportunity / LocationYou share the site, the city and the ambition.
  • Project DiscoveryWe frame goals, constraints and the decision path.
  • Market & Audience UnderstandingCatchment, competition, climate and visitor profiles.

Phase 02

Design

  • Concept DevelopmentThe story, the positioning and the guest journey.
  • Attraction MixThe right combination of attractions for space, budget and market.
  • Preliminary BudgetAn investment band before detailed design.
  • Master PlanningZones, circulation, capacity and phasing.
  • 2D LayoutEquipment placement and clearances on plan.
  • 3D ConceptConcept visuals for decisions and stakeholders.

Phase 03

Equipment

  • Equipment SelectionCurated attractions from a vetted manufacturing network.

Phase 04

Technology

  • Smart Venue SystemsTicketing, cashless, access, CRM and analytics.

Phase 05

Production

  • Supplier & Manufacturing CoordinationOne coordinator across specialist factories.
  • Quality ControlInspections and safety checks before anything ships.

Phase 06

Logistics

  • ConsolidationOne shipment, one set of documents.
  • Export & ShippingSea, air or land to your port or site.

Phase 07

Installation

  • InstallationSupervised assembly and commissioning on site.
  • CommissioningTesting, safety runs and handover.

Phase 08

Opening

  • Staff TrainingOperations, maintenance and safety training.
  • Opening SupportWe stand with you on opening day and the first weeks.

Phase 09

After-care

  • Spare PartsConsumables and critical spares planned in advance.
  • After-Sales SupportRemote support, upgrades and refresh planning.

Project Studio

Design your projectbefore you contact us.

Enter your project, experiment with the space, understand possible solutions and get a preliminary budget — then work with us to execute it.

Concept layout · preliminary design — not for construction

Project budget estimator

How much couldyour project cost?

Eight questions. A preliminary investment band — not a quotation — built from planning rules you can trust, plus where the money typically goes.

01 Location type02 Location03 Space04 Project interest05 Target market06 Capacity07 Budget08 Project scope

Preliminary investment range

USD — — —— — —

Indicative estimate only. Final pricing depends on design, equipment mix, capacity, local requirements, shipping, installation and project specifications.

Attractions

Theming

Systems

Aerial view of an empty plot

Start from

Your location, space and budget.

Not sure what to build?

We’ll help identifywhat to build.

Tell us your location, space and budget. We’ll help identify suitable entertainment concepts.

Location & climate
Area
Budget
Target audience
Indoor / outdoor
Tourism vs local
Start with my location

Project types

21 families.137 project types.

All project types

Smart entertainment venue systems

The digital operating layer of your venue

One card or wristband runs the whole venue: entry, play, pay, redeem, lockers, memberships — and every transaction becomes data you can act on.

Access & admission · Ticketing, Admission, Access control, Turnstiles & gates, Self-service kiosks
Payments & cashless · POS, RFID cards, RFID wristbands, Cashless payment, Recharge systems
Guest & loyalty · Membership, Loyalty, Packages, Promotions, Redemption points
Operations · Staff management, Shift management, Inventory, Race timing
Intelligence · CRM, Reporting, Revenue dashboards, Analytics, Multi-branch management
Explore the operating layer

Global sourcing · China advantage

A coordinated manufacturing ecosystem

Depth of manufacturing, coordinated as one project. You never manage ten factories, three forwarders and an installer — we do.

  • Specialised manufacturersEach attraction family from a factory that only does that.
  • Central coordinationOne coordinator holds every supplier schedule.
  • Quality controlInspections and safety checks before shipment.
  • ConsolidationOne shipment, one document set, one arrival.
  • Export logisticsSea, air or land to your port or site.
  • Single project contactYou talk to one team from site to opening.
Manufacturing network

From vision to opening

Scroll, and watch a site become a destination.

An operating destination at night

Joyventa

From zero
to opening.

Step 01

Empty site

A plot, a hall, a slope. Nothing yet — except the opportunity.

Step 02

Site boundary

We survey, measure and frame what the site can hold.

Step 03

Master plan

Zones, circulation and capacity drawn on the plan.

Step 04

Attractions emerge

The mix is selected, sized and placed — rides, play, water, snow.

Step 05

Systems connect

Ticketing, cashless and access wire the venue into one operating layer.

Step 06

Lights on

Installation, commissioning and training. The venue switches on.

Step 07

People arrive

Opening day — and the first weeks with our team beside yours.

Step 08

Destination

From zero to opening. Then years of after-sales and refresh.

Let’s build your destination.

Joyventa — From empty space to extraordinary destination.